Status

Completed summer 2025

Design

Construction

Funders

Before


After completing numerous smaller stormwater best management practices together, we have identified this site as the community’s highest priority for coastal resiliency due to ongoing threats to infrastructure from increasing storm surges. This location has significant need due to the damaging high tides that periodically wash into and over the bulkhead and the riprap that lines the only access road leading onto the sand spit and community marina. With a lack of natural buffers against flooding and climate change, this area is increasingly vulnerable and the areas behind the riprap are frequently washed out. The peninsula will continually erode without intervention, which will require more costly and hardened infrastructure and impervious surfaces to repair and maintain the community’s recreational access to the area. Coupled with the opportunity to restore habitat to over 650 linear feet of shoreline, Arundel Rivers is excited to break ground on our largest project to date within the Hillsmere community.


After


Arundel Rivers Federation
PO Box 760
Edgewater, MD 21037
Phone: 410-224-3802
Email: info@arundelrivers.org

EIN 52-2301464

2025 Arundel Rivers Federation

Powered and secured by Wix

f559cb_919df5ee261e473db20356756bb88a48~mv2.png
candid-seal-platinum-2025.png
  • Instagram
  • Facebook
  • YouTube
WK Member Blue.png
Waterkeepers Chesapeake Member
bottom of page